Text
Productivity and efficiency gains ensure the project meets schedule
Challenge
- Develop a comprehensive maintenance program for the new electrical equipment being installed as part of the upgrade to the winder
- Ensure that the maintenance strategies were the most cost-effective possible
- Provide the maintenance strategy deliverables in time to enable the client to meet its project schedule
Solution
- Develop initial strategies based on previous project work with the client
- Review and validate these strategies with SME’s from within the client organization and their main contractor
- Optimize the validated strategies
- Generate the project deliverables including load sheets and work instructions for EAM/CMMS
- Implement the project in two phases to enable the client to meet their milestone dates despite the late delivery of documentation from their main contractor
Benefits
- 51 maintenance plans developed for 628 maintainable assets across 42 functional locations
- Optimized strategies maintenance plans comprised of 2,543 tasks optimized for cost and risk
- Optimal spares holding, minimized cost of ownership while reducing risk associated with unavailability of spares
- 83 work instructions developed and included in SAP maintenance plans