Significant increase of total throughput capacity for Iron Ore
Challenge
- Needed to confirm the expected performance of the plant and identify of any significant bottlenecks to the system
- Time constraints (preliminary results desired within 1 week, end results desired ASAP afterwards)
- Limited / approximated information to be used
- Several modelling scenarios required
Solution
- Created Reliability Block Diagram (RBD) which could be used to model, at a high system level, projected performance levels and opportunities to improve for existing & expansion facilities.
- Downtime data allocated for the most significant failures & major delays for the respective systems.
- Simple base logic setup to enable easy updates for each design alternative.
- Sensitivity cases run on all desired design alternatives to determine impact on potential production for each case.
- Clear and simple results comparing the outcomes of all design scenarios.
Benefits
- Fast Modelling: Building the RBD at a high system level allowed for quick and simple modelling & simulating.
- Valuable Results: Resultant numbers from the RBD estimated a significant increase of total throughput capacity with minimal work in redesign.
- Fast time to value: The results from this study were taken onboard within days and used to initiate plant improvement to meet the desired capacity numbers.