Overview

The HOOK Hanger™ Multilateral System from Baker Hughes is the industry’s most diversified and versatile multilateral product, capable of satisfying your most demanding completions requirements in multiple levels as classified by the Technical Advancement of Multilaterals (TAML).

The system includes several multilateral hangers to address the full range of conventional and multistage fracturing completions. Each is complemented by accessory equipment that provides increased functionality designed to simplify operations.

 

C HOOK Hanger

Designed for TAML Level 3 and 4 conventional and unconventional applications, the C HOOK Hanger provides mechanical support to the junction area and gravity assisted main bore access. The C HOOK Hanger is run in the well in one trip with the lateral liner. An unlimited number of these hangers can be installed in the same well in a single casing size.

 

B-3 HOOK Hanger

The B-3 HOOK Hanger also provides mechanical support to the junction in TAML Level 3 and 4 conventional and unconventional applications. The hanger incorporates a tubing-mounted, Model B Lateral Entry Module (LEM) to provide through-tubing selective access and control or isolate flow from the main bore and laterals.  The B-3 HOOK Hanger is run in the well in one trip with the lateral liner, and up to four hangers can be installed in the same well in a single casing size.

 

S-3 HOOK Hanger

Applicable for TAML Level 3, 4, and 5 conventional and unconventional applications, the S-3 HOOK Hanger provides the same junction area support as the other hanger systems. This hanger is also run in the well in one trip with the lateral liner.

Depending on the TAML Level of the junction, the S-3 HOOK Hanger deploys different accessories to provide through-tubing selective access and control flow from the main bore and lateral. For TAML Level 3 and 4 junctions, the Model S-2 Lateral Entry Nipple (LEN), a tubing-mounted completion accessory, is installed into the 9-5/8-in. S-3 HOOK Hanger. Alternatively, a S-3 Dual Seal Module (DSM) completion accessory can be installed with the production string to convert a Level 3 or Level 4, 9-5/8-in. S-3 HOOK Hanger into a Level 5 junction. The DSM can be run on parallel tubing strings or the flow can be comingled using a selective re-entry tool (SRT).

Contact us today to learn how our HOOK Hanger Multilateral Systems can help you optimize your next wellbore construction.




Fragen Sie den Experten.

Ihre Anfrage wurde abgeschickt.
Vielen Dank für Ihr Interesse. Ein Experte wird sich in Kürze mit Ihnen in Verbindung setzen.