Highlights


Benefits

  • Minimize heavy equipment and personnel at the wellsite
  • Reduce well cleanup times and costs by 50% compared to conventional operations
  • Eliminate high-pressure gas and chemicals to minimize environmental impacts
Applications

  • Vertical, deviated, horizontal, and multilateral wells, onshore and offshore
  • High-risk cleanup operations requiring an alternative to CT nitrogen-lifted cleanup methods
  • Cleanup operations in larger tubing requiring faster pump rates
Overview

Effective well cleanup is an essential post-completion step to getting your reservoir ready for long-term production. But in long, complex wells, flowback and cleanout are risky and time-consuming via conventional coiled-tubing (CT) nitrogen lift operations.

The JumpStart™ well cleanout service from Baker Hughes delivers a highly reliable, cost-effective alternative to conventional well cleanups requiring heavy interventions. JumpStart temporarily installs a slickline-retrievable AccessESP™ retrievable electric submersible pump in the well to remove heavyweight kill fluids—in half the time required for a CT-deployed nitrogen lift operation. As a result, you can bring your well into production far earlier and with lower transportation costs, fewer heavy lifts, and a smaller rig crew.

During times of high CT rig rates and uncertain availability, the JumpStart service provides a faster, more reliable, and cost-effective cleanout solution for your high-value wells.  

Contact us to learn how the JumpStart well cleanout service can get your wells into production with less uncertainty, risk, and delay.




Contactez un expert.

Votre demande a bien été envoyée.
Merci de votre intérêt. Un spécialiste vous contactera bientôt.