Overview


Challenges
  • Mitigate DLS in lateral
  • Trouble-free casing run
  • Drill the fastest, most consistent wells in the basin
  • Reduce days on well
Results
  • A smooth well profile with an average DLS of 1.4°/100 ft in the lateral
  • Drilled a perceived record of 10,067 ft in 24 hours
  • The fastest well in the basin
  • Saved a full day of drilling




Case study details

Baker Hughes and a major operator have long been one of the most successful partnerships in Northeast US Land, consistently drilling record Mile-A-Day (MAD) wells. Beginning in 2016, the partnership have drilled over 140 MAD wells, including 12 over 8,000 ft, and the previous record of 9,649 ft in a single day.

Download the PDF to read the full case study.

/sites/bakerhughes/files/2020-05/AutoTrak-RSS-drilled-record-10-thousand-cs.pdf