Case Study
HPump system saved $295,000 USD for water flood operator
Jun 24, 2020
A customer operating a water flood with 1% oil cut in northeastern Oklahoma was experiencing extensive nonproductive time (NPT) and rising maintenance costs caused by a triplex pumping system to re-inject 28,000 barrels of produced water daily.
Download the PDF to read the full case study.