Overview


Challenges
  • Water flood with 1% oil cut
  • 28,000 BWPD injection rate
  • High operating expense and NPT using triplex pump reinjection system
Results
  • Reduced downtime 67% to just one day per month
  • Saved 6,168 bbl oil deferred production
  • Reduced annual maintenance by $48,000 USD




Case study details

A customer operating a water flood with 1% oil cut in northeastern Oklahoma was experiencing extensive nonproductive time (NPT) and rising maintenance costs caused by a triplex pumping system to re-inject 28,000 barrels of produced water daily.

Download the PDF to read the full case study.

/sites/bakerhughes/files/2020-05/HPump-saved-water-flood-operator-295K-Oklahoma-cs.pdf