Overview


Challenges
  • Design compact and reliable solutions tailored for each customer and project in a shorter delivery time
  • Lean project management and simplified project execution
  • Optimization of compressor operating points
Results
  • Pre-engineered package developed in partnership with customer, minimizing the technical alignment cycle
  • Predefined documentation available since the beginning of the project
  • Reduced installation and commissioning activities/time
  • Optimized customer spare parts stock




Case study details

To help offshore operations get up and running faster, we conceived of a pre-engineered package based on a building-blocks philosophy that can be tailored to customer specifications. A consolidated library of packages is already in place for some customers, and it can be expanded based on their needs. With ready-to-manufacture configurations and predefined documents available at the very beginning of a project, time to market can be significantly shorter.

 

Get the full story in PDF
 