PROJECT SPOTLIGHT

Discover how the IWS team designed an integrated, 100% electric P&A solution to align with the operator’s objectives and then, executed it perfectly in the field.



Photo of a well abandonment operation in the field.
ENERGY TRANSITION

Well abandonment: when an end is a beginning

Uneconomical oil and gas wells are permanently being closed all over the Netherlands, using a world-first, fully electric rig-less setup.

Overview
 
 
Minimize the time, costs, and risks of your plug and abandonment campaign

Integrated Well Abandonment services from Baker Hughes combine proven technologies, application expertise, and efficient job planning and execution, our abandonment services deliver reliable, safe, and cost-effective solutions for any plug and abandonment (P&A) challenge you face.

 

Solutions from start to finish

Baker Hughes works with you at every step of the abandonment process—from project planning to coordination to execution—to deliver flexible and scalable solutions tailored to your specific needs. Our Integrated Well Abandonment services bring industry-leading experts, technologies, and management solutions to transform your P&A campaign into a seamless final step in your well’s lifecycle.

 We are committed to supporting and enhancing your well abandonment programs in several significant ways.

  • Develop and enhance your well abandonment philosophy with the help of Baker Hughes Reservoir Technology Services (RTS). Our RTS experts help you interpret regulations and guidelines; provide insights into the best abandonment approach for a given field; evaluating the utilization of salt caps, shales, cement, mechanical barriers, and combined plugs to optimize your well’s final barrier designs. 

  • Reduce uncertainties while isolating your zones of interest with wide-ranging well integrity evaluation tools. By deploying the right combination of integrity evaluation and analysis, you’re assured more efficient well abandonment operations that protect the environment and your bottom line. 

  • Install permanent barriers across the well to fully isolate all reservoir producing or injecting zones from the surface. Baker Hughes can bring together fit-for-purpose perforating technology, mechanical barriers, through-tubing barrier placement methods and cementing, or alternative barrier materials to deliver reliable, cost-effective solutions.

  • Minimize the time required to abandon a well. Permanent isolation of all intermediate zones with flow potential involves major steps in the well plug and abandonment process. The application of industry-leading well intervention cutting, pulling and milling technologies and collaborative engagement drives down the time to abandon a well and enables rapid adaptation to unforeseen circumstances.

Save time and money with our rigless and riserless solutions while installing the near-surface plug and removing the wellhead and conductor.  Our tubular experts deploy the right equipment and services to effectively remove tubing, casing, and conductors. Well abandonment is part of the Baker Hughes Integrated Well Services approach to managing your field operations safely, reliably, and cost effectively. Our offerings in well abandonment are unique for providing cost focus where required, and value focus where you need it. For operational environments ranging from onshore to offshore to subsea, we provide abandonment solutions with a proven track record of significant performance improvement.

Contact us today to learn how Baker Hughes Integrated Well Abandonment services can help you optimize your P&A activities at minimal cost and risk.




Get in touch with an expert.

Your request has been submitted.
Thank you for your interest. A specialist will be in touch with you shortly.

Integrated well abandonment

FILTER BY:
RESET
107 RESULTS