Highlights
Highlights
Benefits
- Up to 40% efficiency in simple cycle; more power with retained maintainability and reliability
- Modular exchange philosophy and easy maintenance deliver best-in-class availability and reliability
- Maximized fuel flexibility: can operate on a wide range of both liquid and gas fuels
Features
- 17-stage high-pressure axial compressor
- Annular combustion chamber with maximized flexibility and 25 ppm NOx and CO with Dry Low Emission system (DLE1.5)
- Two options: low-speed power turbine (LM2500+G4) or high-speed power turbine (PGT25+G4)
Applications
- Onshore, off-shore
- Pipeline, gas storage
- Industrial, power generation, combined heat and power
Overview
Overview
The PGT25+/LM2500+G4 turbine draws its high efficiency and light weight from our aeroderivative technologies proven in energy applications and aircraft engines, while its ruggedness is inherited from our frame gas turbine designs.
PGT25+G4 for mechanical drive
DLE
SAC
Power (MW)
33.7
33.9
Efficiency (%)
40.5
40.6
NOx emissions (ppm)
25
25
Exhaust temperature (ºC)
510
510
Speed (rpm)
6,100
6,100
Boroscope inspection (hours)
8,000
8,000
Hot section inspection (hours)
25,000
25,000
Major inspection (hours)
50,000
50,000
Package dimensions (m)
11.06x4.01
11.06x4.01
At ISO conditions with natural gas fuel, ambient temperature 15ºC, no inlet or exhaust losses, sea level, 60% relative humidity. Extended maintenance plan is available to increase plant availability; contact Baker Hughes to define your customized service contract needs. Package dimensions exclude driven equipment. 25 ppm NOx SAC configuration with water injection.
LM2500+G4 (50Hz) for power generation
DLE
SAC
Power (MW)
32.5
32.7
Efficiency (%)
37
37.1
NOx emissions (ppm)
25
25
Exhaust temperature (ºC)
543
543
Speed (rpm)
3,000
3,000
Boroscope inspection (hours)
8,000
8,000
Hot section inspection (hours)
25,000
25,000
Major inspection (hours)
50,000
50,000
Package dimensions (m)
16x3.4
16x3.4
At ISO conditions with natural gas fuel, ambient temperature 15ºC, no inlet or exhaust losses, sea level, 60% relative humidity. Extended maintenance plan is available to increase plant availability; contact Baker Hughes to define your customized service contract needs. Package dimensions include driven equipment. 25 ppm NOx SAC configuration with water injection.
LM2500+G4 (60Hz) for power generation
DLE
SAC
Power (MW)
33.6
33.9
Efficiency (%)
39.4
39.5
NOx emissions (ppm)
25
25
Exhaust temperature (ºC)
527
527
Speed (rpm)
3,600
3,600
Boroscope inspection (hours)
8,000
8,000
Hot section inspection (hours)
25,000
25,000
Major inspection (hours)
50,000
50,000
Package dimensions (m)
16x3.4
16x3.4
At ISO conditions with natural gas fuel, ambient temperature 15ºC, no inlet or exhaust losses, sea level, 60% relative humidity. Extended maintenance plan is available to increase plant availability; contact Baker Hughes to define your customized service contract needs. Package dimensions include driven equipment. 25 ppm NOx SAC configuration with water injection.
Well-known technology
The PGT25+/LM2500+G4 is a proven design based on LM2500 gas generator technology with more than 100 million industrial operating hours, and aircraft engine experience with over 350 million flight hours.
Ease of maintenance and high unit availability
The package is preassembled and tested in our facility to minimize on-site assembly time. The gas generator and low-pressure turbine can each be easily and quickly removed and replaced, and full engine replacement performed in just 48 hours. An optional extended maintenance plan is available—increasing boroscope interval by 2,000 hours, hot section inspection by 5,000, and major inspection by 10,000.
Enhanced fuel flexibility
The turbine can operate on a wide range of liquid and gas fuels while reducing NOx and CO emissions to 25 ppm, thanks to its DLE1.5 combustion system.