Highlights


Benefits

  • Reliable isolation solution that meets well regulatory requirements
  • Increases the success and reliability of well suspension operations
Features

  • V0-R qualified as per API 11D1
  • Pressure rating up to 5,500psi
  • Temperature rating up to 250°F
  • Optional junk catcher integration
  • Slim OD design
Applications

  • Well barrier for well maintenance or workover activities
  • Temporary Well Suspension
  • Zonal isolation
  • Water/gas shut off
  • Tubing/completion testing

Overview

Selecting the right mechanical barrier is a critical step in any successful well operation. The Baker Hughes MidEXP Retrievable Bridge Plug is a high performance well isolation solution designed for use in zonal isolations during stimulation, cementing applications or temporary well suspension operations.

The retrievable bridge plug can be deployed quickly and accurately on wireline, slickline or coiled tubing utilizing the Baker Hughes E-4 #10 wireline pressure setting assembly, an equivalent #10 Wireline setting tool or hydro-mechanically on coiled tubing/pipe using the #10 Hydraulic setting tool. The bridge plug can also be equalized and retrieved using slickline, coiled tubing or pipe with the use of an industry standard GS pulling tool.

The API 11D1 V0-R qualified well barrier is capable of withstanding well parameters of up to 5,500psi differential pressures at well temperatures up to 250°F. To minimize impact of debris related issues during retrieval the bridge plug can be deployed with a junk catcher. The junk catcher is retrieved in a dedicated trip which also can allow for equalization of the bridge plug prior to release.

Contact your Baker Hughes representative today to learn how the V0-R Retrievable bridge plug can meet your well Isolation operations.


Mettetevi in contatto con un esperto.

La vostra richiesta è stata inoltrata.
Grazie per l'interesse dimostrato. Uno specialista vi contatterà a breve.