Highlights

Highlights


Benefits

  • Optimized design with special metallurgy and features for long life in any process conditions (5 years of uninterrupted running)
  • Full testing including mechanical integrity (4 hrs running @MCS above 1,000°F (538°C), and performance evaluation at site
  • Parts and design upgrades available for installed units from Baker Hughes and other OEMs
Features

  • Outer casings designed according to ASME standards with heat treatment for optimal structural and corrosion resistance
  • Integral stator shroud improves efficiency and reduces cone stress while improving maintainability and ease of disassembly
  • Optimized aerodynamic gas path for high efficiency and minimum erosion by using state-of-the-art design and protective coatings
Applications

  • Fluid catalytic cracking (FCC)
  • Otherwise wasted flue gas

Overview

Overview

Baker Hughes's hot gas expanders are available in a wide range of frames and sizes to best match any demanding FCC tail-gas recovery application. The single-stage design with highly accurate flow-path enable high reliability and maintainability, and best-in-class performance.

 

Specifications
Max. shaft power
55 MW
Max. inlet flow
180 kg/s
Max. inlet pressure
3.5 barg
Max. inlet temperature
760°C

 

 Frame-selection table

Hot Gas Expanders Frame Selection Table

 

Power and cost recovery

An average 18 MW Baker Hughes hot gas expander for power recovery can save approximately $9 million per year in refinery electricity costs, and avoid more than 244,000 metric tons of CO2 emission per year.

Hot Gas Expanders Power Cost Recovery

 


Mettetevi in contatto con un esperto.

La vostra richiesta è stata inoltrata.
Grazie per l'interesse dimostrato. Uno specialista vi contatterà a breve.